Our Services
At EPN Consultants, we deliver comprehensive civil engineering solutions tailored to our clients' diverse needs. Our expert team ensures precision, efficiency, and sustainability in every project, from concept to construction.
With extensive experience in both public and private sectors, we collaborate with a range of professionals—architects, contractors, project managers, developers, and structural engineers—to provide practical and cost-effective solutions in areas such as roads, drainage, earthworks, and flood risk management.
-
Description text goes here
Vehicle and pedestrian access in and around the site
Drainage connections
Vehicle tracking and visibility splays
Site investigation review
Preliminary cut and fill Indication on utilities diversion
-
3D road design
Vertical and horizontal alignment
Right turn lane design
T junction design
Roundabout design
Road marking and signs
Vehicle tracking and visibility splays
-
For roads, footpaths, driveways, car parks, etc
Sub-base calculations and specifications
Pavement calculations and specifications
Kerb layout and specifications
Surface finishes layout and specifications
-
S278 Agreement — alterations or improvements to public highway
S38 Agreement — public adoption of new highway infrastructure
S184 Agreement — new vehicular access within public highway
S106 — application to connect to a public sewer
S104 — adoption of new sewers, pumping stations and treatment works
Public sewer diversion
Building close to public sewers
Building over public sewers
-
3D drainage design model
Surface and foul water layouts
Surface and foul water hydraulic calculations
SuDS solutions
CCTV review (repairs schedule and layout)
Manhole and pipe schedules
-
Flood risk assessment report
Surface water drainage strategy and flood mitigation measures
SuDS management and maintenance plan
-
Sitewide proposed levels model
Formation level model
Cut and fill optimisation
-
Based on records or underground utilities survey provided by others
3D existing utilities model
Proposed works and existing utilities clashes layout
Diversion routes layout*
*in collaboration with services’ respective discipline and providers
-
POL 3 surface water run-off and minimising watercourse pollution form
Input into waste credits by assessing the waste generated through earthworks
-
3D drainage model IFC file
3D proposed surface IFC file
3D proposed services model IFC file*
*in collaboration with services’ respective discipline and providers
Whether you need an entire package or an individual service, we’re excited to be part of the design team.
Feasibility Studies.
-
Schematic Road Design — horizontal and vertical alignment, vehicle access in and around the site, drainage, kerbing
Schematic Levels Strategy Options — indication on FFLs, pedestrian access in and around site and buildings, ramps, steps and retaining walls
Schematic Drainage Strategy Options — foul and surface water layouts, connections assessment, indication on SuDS solutions and attenuation volumes, no indication of pipes or manhole sizes
Vehicle Tracking & Road Layout Review — swept path analysis for refuse, emergency or any other vehicle, visibility splays, feedback notes on site layout
Site Investigation Review — contamination, infiltration, CBR design values, frost susceptibility, etc.
Preliminary Cut & Fill — proposed and existing surface comparison (no buildups included)
Indication on Utilities Diversion — subject to underground utilities survey provision
Assisting with surveys requirements — CCTV, topographical, site investigation, underground services
Planning Support.
-
Road Design — horizontal and vertical alignment, junctions design, road sub-base and pavement design, drainage, surface finishes, kerbing
Levels Design — FFLs, access to and around buildings, car parks, driveways, footpaths, garden levels, retaining walls, slopes, SuDS representation, site perimeter treatment
Cut & Fill Optimisation — indication on savings based on site levels design iterations
Drainage Design — foul and surface water layouts, SuDS design and specification, hydraulic calculations for both foul and surface water
Flood Risk Assessment Report
Surface Water Drainage Strategy & Flood Mitigation Measures
SuDS Management & Maintenance Plan
Visibility Splays Layouts
Vehicle Tracking Layouts
BREEAM Input — POL 3 surface water runoff and minimising water course pollution; input into waste credits by assessing the waste generated through earthworks
Detailed Design.
-
Road Design — construction details, longitudinal sections, cross-section
Levels Design — cut and fill, discharging of planning conditions
Drainage Design — construction details, manhole schedules, discharging of planning conditions
CCTV Review — repairs schedule and layout
External Works — construction details for footpaths, driveways, car parks, kerbs, edging, etc
Construction Phase.
-
Formation Level — for roads and external works
Setting Out — for roads and drainage
Statutory Agreements — S278, S38, S106, S104, building close to or over public sewers, sewer diversion
Site Visits & Reports
Addressing Site Queries
